PROJECT REFERENCES
Over the last few decades, the Pai Kane Group has completed a whole lot of exciting projects the world over.
Below is a set of illustrative projects:
GRAND PRIX, SINGAPORE
GRAND PRIX, SINGAPORE
This world-famous Formula 1 sport is conducted at night and is powered by Diesel Generator Sets and Switchboards. We have supplied 25 numbers of 500 kVA and 25 numbers of 250 kVA Volvo Penta engine powered Diesel Generator Sets with Comap IG-NTC-BB, Intellivision 8+ and inbuilt synchronization.
WORLD BANK, AFGHANISTAN
WORLD BANK, AFGHANISTAN
Supply and commissioning of 2×1250 KVA & 1 x 250 KVA emergency Gensets built to spec in 75 Db reinforced containers, with a waste heat recovery system built on its roof to deliver hot water to the compound.
Besides, all Controls, Power and distribution with Bus ducts, Cables, Switchboards ( 65 KA) AVR, UPS and Emergency Load banks for self testing and diagnostics with remote monitoring capability.
MOLBIO DIAGNOSTICS
MOLBIO DIAGNOSTICS
One of our most prestigious turnkey projects for Molbio Diagnostics at Verna, Goa.
The system includes installation of a roof mounted 825Kwe Solar Power plant with integration to 3 x 650 KVA Diesel Gensets, Switchboard’s and a 3150 KVA 33 KV Grid supply.
The solar power plant will be the chosen source to supply the power and the balance will be sourced from the Grid and the Gensets thereafter as required.
ARBOR BREWING COMPANY, INDIA
ARBOR BREWING COMPANY, INDIA
A craft beer needs a craft solution to its power requirement, the plant is powered by two numbers of 125 kVA Diesel Generator Sets, 250 kVA Compact Substation, Stabilizer, LT Panel and a Solar Photovoltaic Plant of 65 kW.
The system installed intelligently selects the cheapest power between the Grid, Solar & DG, to give to the most optimum solution at all times.